general information |
name / height regime | ONE HERASTRAU TOWERS 2S+P+10E+11EDUPLEX+ETH |
adress | 74A NICOLAE CARAMFIL, BUCHAREST |
start to completion | 2019 - 2022 |
total land area | 5497 sqm |
total constructed area | 30982 sqm |
architecture | X ARCHITECTURE & ENGINEERING CONSULT |
structure | ALLIED ENGINEERS |
interior design | LEMON INTERIOR DESIGN |
mep | ALLIED ENGINEERS |
facade design | X ARCHITECTURE & ENGINEERING CONSULT |
Taking advantage of its location at the confluence of two large residential areas in the north of Bucharest, the One Herăstrau Towers development is another model of urban regeneration conceived by XAE. With two residential towers cumulating around 140 apartments and a 5250 m2 podium with commercial functions, showrooms and offices on the first two floors, the One Herăstrau Towers project is a mixed-use complex to be completed in 2022.
"One Herăstrău Towers was conceived through a gateway open to the city - so not as a (de)limitation, the two apartment towers celebrating the panoramic views towards Lake Herăstrău and the northern area of Bucharest. The towers have a deliberately homogenous massing, with elements that accentuate the vertical and diminish their massiveness. The upper volume of each tower emphasizes the panoramic opening through curtain walls, skylights and generous terraces at height." - Marius Călin
"The idea of visual permeability at the base of the building, intended to create a mutual connection between the interior and the exterior, has been technically realized with some special solutions such as the use of curtain wall systems on two levels at the base of the building (very high heights of 7 and 8m)" - Mariana Turcu
"The cube: placed serenely on the 1st floor, as an extended protrusion beyond the footprint of Tower B, to express the attraction to the street, to the city, to the eastern side and functionally suspended above the entrance to the ground floor commercial spaces, with an improbable 6m cantilever." - arch. Sibila Popovici